1. Purpose
This policy sets out the eligibility requirements, conditions and limits of financial assistance available to consumers under the Tasmanian Government’s Financial Assistance Package (the Scheme), including assistance for deposits, incomplete residential building work, defective work and breaches of statutory warranties.
The policy supports consistent, fair and accountable decision making by Building Standards Tasmania and reflects the Government’s intention that the Scheme operates in a manner broadly aligned with a future Home Warranty Insurance (HWI) scheme.
2. Policy statement
The Tasmanian Government provides financial assistance on an ex-gratia basis to eligible consumers who have suffered financial loss in connection with residential building work following the death, disappearance or insolvency of their building contractor. Assistance may be available for deposits, non-completion, defective work and breaches of statutory warranties, subject to the requirements of this policy.
The Scheme is a measure of last resort. Financial assistance is discretionary and does not create an entitlement to payment.
3. Scope
This policy applies to consumers seeking financial assistance for eligible residential building projects located in Tasmania. It sets out the circumstances in which assistance may be available, the applicable exclusions and limits, and the rights and responsibilities of applicants.
4. Legislative and policy authority
This policy is informed by the following legislation and the Government’s approved Scheme parameters:
- Building Act 2016 (Tas)
- Residential Building Work Contracts and Dispute Resolution Act 2016 (Tas)
- Residential Building (Home Warranty Insurance Amendments) Act 2023 (Tas)
- Cabinet Minute dated 10 February 2022: Parameters of Financial Assistance Package for Consumers Affected by Insolvencies in the Residential Building Industry
5. Definitions
Defective work
Defective work, in respect of insurable work, includes:
- defective work within the meaning of the Building Act 2016 (Tas); and
- other work that fails to meet the prescribed standards, or prescribed requirements, for the work.
Disappeared
The building contractor is unable to be found in Australia after reasonable search and enquiry. What is considered reasonable will vary on a case-by-case basis and Building Standards Tasmania will make the final determination after following a number of steps to contact the builder. A builder will not be considered to have disappeared solely because they have ceased communicating with the consumer.
Insurable work
Insurable work includes residential building work other than residential building work specified under section 77B of the Residential Building (Home Warranty Insurance Amendments) Act 2023 (Tas).
Insolvency
Insolvency in relation to:
- An individual means an individual who has been declared bankrupt and has not been discharged from bankruptcy, or a person who has executed a personal insolvency agreement; or
- A corporation means a corporation that is in liquidation or has been deemed insolvent by an Administrator and will not continue to trade.
Guidance is sought from the appointed Administrator in each case. If a Deed of Company Arrangement is executed and the control of a company reverts to the Director of the company, then the company is deemed to be solvent.
A builder in voluntary administration may not be insolvent and can keep operating. The administration process will decide whether the builder is insolvent.
Loss
Loss has the meaning given in section 77A of the Residential Building (Home Warranty Insurance Amendments) Act 2023 (Tas).
Owner
Owner has the meaning given in section 4 of the Building Act 2016 (Tas).
Residential Building
Residential Building has the meaning given in section 5 of the Residential Building Work Contracts and Dispute Resolution Act 2016 (Tas).
Residential Building Work
Residential Building Work has the meaning given in section 6 of the Residential Building Work Contracts and Dispute Resolution Act 2016 (Tas).
Scheme
The Tasmanian Government Financial Assistance Package approved by Cabinet on 10 February 2022.
Statutory warranty
Implied warranties arising from a residential building work contract, consistent with Part 6 of the Residential Building Work Contracts and Dispute Resolution Act 2016 (Tas).
Trigger event
The death, disappearance, insolvency, bankruptcy, or cessation of existence of a building contractor.
6. Background
The Financial Assistance Package provides discretionary financial assistance to eligible consumers affected by a trigger event. The Scheme was established in February 2022 in the absence of a Tasmanian HWI scheme and is a measure of last resort.
Initially, assistance focused on non‑completion of residential building work and unpaid deposits. Defect and statutory warranty claims are a standard feature of HWI schemes in other jurisdictions and were formally accepted under the Scheme from June 2024. This is an ex-gratia Scheme and does not create legal entitlement to payment.
7. Policy principles
7.1 Tasmanian location
Financial assistance is only available for eligible residential building projects located in Tasmania.
7.2 Valid residential building contract
A claimant must demonstrate that a valid written residential building work contract existed for work valued at $20,000 or more, and that the work was insurable work.
7.3 Proper claimant
Assistance is available only to a person or legal entity that has incurred an eligible loss. A subsequent owner may be eligible where the statutory warranty period has not expired, and they have incurred an eligible loss.
7.4 Qualifying builder failure
The Scheme is a measure of last resort. A qualifying trigger event is the death, disappearance or insolvency of the builder or building company.
Building Standards Tasmania seek written confirmation of a builder’s death from Births, Deaths and Marriages.
A builder is not regarded as having disappeared merely because they have stopped responding to messages. Whether a builder cannot be found after reasonable searches and enquiries depends on the circumstances.
A company entering voluntary administration is not necessarily insolvent for the purposes of the Scheme. Its status and ability to continue trading must be considered in light of the available evidence.
7.5 Types of assistance
Subject to the eligibility requirements, assistance may be available for:
- a deposit paid where building work has not commenced;
- building work that has commenced but remains incomplete, including payments for goods or services not received;
- defective residential building work; and
- loss associated with a breach of an applicable statutory warranty.
7.6 Maximum payment
The maximum combined payment for eligible incomplete work and defective work, including statutory warranty claims, is $200,000 per building project. Any payments previously made under the Scheme for the same building project count towards this maximum. Further information about payment limits and the calculation of assistance is provided in section 16 – Payments and Quantum.
8. Defects and statutory warranties
8.1 Defects
Defective work includes work that does not comply with the Building Act 2016 (Tas) or the National Construction Code as in force at the time the work was performed, or work that fails to meet applicable prescribed standards or requirements. There is no separation between structural and non-structural elements, and the Scheme does not automatically exclude non-structural defects.
8.2 Statutory warranties
Statutory warranty matters may include work performed without due care and skill; work not in accordance with plans and specifications; unsuitable materials; non-compliance with applicable legislation; unreasonable delay; or a dwelling that is not reasonably fit for its intended purpose.
8.3 Warranty period
Defects and statutory warranty claims are generally considered within six years from practical completion of the relevant work. Where the work is incomplete, the relevant period may be measured from the later termination of the contract or the date the builder last performed work.
9. Incomplete work
Incomplete work generally refers to residential building work left undone or unfinished by a builder contractor. It includes work specified in the building contract that has not been performed or finished (such as missing structural elements, uninstalled fixtures required by the contract, or a project abandoned before reaching practical completion). Before practical completion, and while the contract is on foot and not terminated, the contractor is entitled to perform and complete any incomplete work under the contract.
Building Standards Tasmania may commission independent inspections in accordance with contractual arrangements to make a determination about incomplete work.
If an applicant submits a claim for incomplete work that has already been completed by a subsequent builder or as an owner builder (following a trigger event), Building Standards Tasmania require relevant evidence as outlined in internal assessment procedures.
10. Notification timeframe
A claim for defective work or breach of statutory warranty must be lodged within a reasonable timeframe.
Building Standards Tasmania may accept claims lodged outside this timeframe where exceptional circumstances are demonstrated and no substantive prejudice arises. The onus is on the claimant to justify late notification.
11. Eligibility and assessment requirements
Assistance may be available where:
- the residential building project is located in Tasmania;
- the consumer entered into a valid written residential building work contract with a builder for work valued at $20,000 or more;
- the builder died, disappeared or became insolvent after 1 July 2021;
- the consumer has suffered an eligible financial loss associated with the contracted work; and
- the other conditions and exclusions in this policy are satisfied.
A contract may have been signed before or after 1 July 2021. Eligibility depends on the date of the qualifying builder failure, not solely on the contract date. Contractors, subcontractors and suppliers seeking payment for amounts owed by a builder are not eligible under this consumer Scheme.
Claims relating to defects or statutory warranties must be supported by evidence of a direct connection between the claimed defect or loss and the builder’s work.
12. Exclusions
Financial assistance is generally not available for:
- normal wear and tear, inadequate maintenance, misuse or abuse;
- pre-existing problems unrelated to the contracted building work;
- damage arising from the acts of others, or from designs or materials supplied by the owner;
- damage caused or worsened by an unreasonable failure to prevent further loss;
- purely cosmetic matters, except where the circumstances warrant consideration;
- damage caused by flooding or other external events, except where an eligible underlying building defect is established;
- items beyond their reasonable working life or applicable manufacturer warranty; or
- indirect or consequential losses such as lost rent, utility charges and costs associated with delay.
The circumstances of each claim will be considered, including whether there is a direct connection between the claimed loss and the builder’s work.
13. Claims assessment and evidence
Applicants may be asked to provide a signed contract, evidence of payments and financial loss, inspection reports, quotations, invoices or other relevant supporting documents.
Claims for defects may require assessment by a suitably qualified expert to establish the cause and reasonable cost of rectification.
Building Standards Tasmania may commission independent inspections in accordance with contractual arrangements to make a determination about incomplete work or defective work.
14. Multiple and subsequent claims
More than one claim may be considered in relation to the same building project where a further eligible loss is identified and the combined assistance does not exceed the Scheme maximum.
A subsequent owner may be eligible to claim in relation to statutory warranties during the warranty period, provided they have suffered an eligible loss. The Scheme maximum does not reset when the property is sold. Where ownership has changed, entitlement depends on the particular circumstances and who incurred the loss.
Financial assistance is not paid more than once for the same unrepaired defect or loss already met by the Scheme.
15. Claimant obligations
Applicants must provide complete and accurate information about their contract, payments, losses and the circumstances of the builder’s failure. They must provide reasonable supporting evidence and cooperate with requests needed to establish eligibility.
Applicants are expected to take reasonable steps to minimise their loss. Unreasonable delays or refusal of a reasonable opportunity for the builder to rectify problems before a qualifying trigger event may affect the assistance available.
16. Payments and quantum
Where a deposit has been paid but construction has not commenced, assistance is limited to 5% of the contract value.
Where work has commenced but is incomplete, assistance for eligible loss is limited to 20% of the contract value.
Eligible defects and statutory warranty claims may be supported up to the applicable Scheme maximum, based on reasonable rectification costs and proven loss.
The maximum assistance available under the Scheme is $200,000 per building project. Previous payments for the same project count towards this maximum. The Scheme does not guarantee reimbursement of every expense or the full amount of loss.
Payment for eligible rectification may be based on reasonable quotations for work not yet completed or supported costs already incurred. A further claim for additional eligible loss may be considered, subject to the Scheme maximum.
Indirect costs such as lost rent, utility charges and delay-related costs are not covered.
17. Transitional arrangements
A residential building contract may have been signed before or after 1 July 2021. For Scheme eligibility, the qualifying trigger event must have occurred on or after 1 July 2021. Defect and statutory warranty claims are subject to the applicable requirements and timeframes in this policy.
18. Review of decisions
Applicants will be advised of the decision on their claim. A person who disagrees with a decision may request an internal review in writing within 30 days of receiving the written decision. The request should explain why the decision is considered incorrect and identify any relevant evidence that should be reconsidered.
Reviews are conducted by the Director of Building Standards Tasmania.
The review outcome is final under the Scheme’s ex-gratia review arrangements. This does not purport to remove any independent rights a person may have under applicable law.
19. Fraudulent, false or misleading claims
The Tasmanian Government may refuse or adjust assistance where information is materially false or misleading. Suspected fraud may be referred to the relevant authorities. Any recovery of payments is subject to applicable legal authority.
20. Policy governance and review
This policy may be updated to reflect changes to the Scheme, relevant legislation or Government policy, but in any event will be reviewed every two (2) years. The current public information and application arrangements are available on the Consumer Affairs Tasmania and Building Standards Tasmania website.